Commentary about volunteering to overhaul the 200 hp LeRoi engine in a Whitcomb switch locomotive for a non profit museum. I got it running in 2009. TitanX Donated a new radiator core in 2011. Plymouth locomotive arrives 2014.
Monday, September 26, 2011
Putting antifreeze in the radiator
September 26 was a beautiful day. My son Dave and our friend Jim had breakfast at Colt Station Pa and headed up to the museum to put antifreeze in the Whitcomb. I connected the battery and started the engine. I had put 5 gal of grease in the transmission the day before. That only brought the tranny fluid level to ‘low’. I still had a hard time getting the drive train to stop moving so that I could shift the transmission into gear. I finally got it in gear and backed up to remove the chocks. I had 110 lbs of air pressure, now more than I want, so I have to adjust it down. We set the switches and moved up to the water hose. I drained the radiator and each cylinder block and both water cooled manifolds. Then I put all the drain plugs back in. Jim and I mixed antifreeze and water 50/50 in 5 gal buckets. I handed them up to Dave who poured them in the radiator. We put in 24 gallons of mix and did not fill up the radiator but we felt that we were close. I went up to the hardware store and bought 2 more gal of antifreeze. We mixed that up and added it. We were still not full but decided to stop there. I started the engine and moved up to the GE 2501, then we parked the Whitcomb and went to lunch.
The Whitcomb engine has an oil leak due to a stripped threads on one of the bolts on an engine access cover. It needs more oil, gas, grease and antifreeze.
Sunday, August 7, 2011
Some progress
Since July I had trouble getting the clutch on the train to disengage. When the clutch is disengaged the mechanism applies a brake to the drive shaft. I took the PTO brake out and bought a lining for it, I discovered that one of the valves in the train’s air compressor had become loose and was not working. Saturday I took the valves out of the spare air compressor at the museum. Charlie was there and helped me. Sunday morning I put the best valve in the Whitcomb’s air compressor and installed the relined PTO brake shoe. The new radiator has been holding water well. After lunch the engine started and we moved it back and forth on the track. Jim moved his speeder down past the freight house and Ray, Charlie and I took the Whitcomb down the track and across the diamond. The engine ran great running West but ran rough coming back. Monday I took a carburetor out and cleaned it.
Saturday, July 23, 2011
2nd Annual LSRHS Tractor Show
I removed the valve cover on the Whitcomb's air compressor and found a damaged exhaust valve. This is why it is not making full pressure. There is a brake shoe on the PTO shaft to stop the drive shaft so that you can shift gears. I removed the brake shoe for relining. Ed and Jim from Conneaut Engine works brought a hit and miss engine to the tractor show.
Saturday, June 18, 2011
2011 Night at the Museum
The 3rd weekend of June The LSRHS was open 24 hours. A portable generator provided lights for the CSX mainline for night train watching. Chris Bohn showed up and we topped off the Whitcomb's new radiator. It didn't take much. The engine started and ran well. We could only get about 30 pounds of air pressure. The clutch would not disengage so we couldn't move the Whitcomb. Ray and Jim operated Ray's Nickel Plate Speeder
Monday, May 30, 2011
Memorial Day 2011
Ray moved the Whitcomb up by the station so that it would be closer to the water faucet. Sunday was the day of the LSRHS volunteer cook out and pot luck supper. The Whitcomb was to be filled with water and run. We filled the water Saturday morning but it had a pretty good leak where at a gasket joint. (not the radiators fault). I went to the hardware store and bought a needle that you use to inflate soccer balls. I attached that to a tube of silicone sealer and injected it into the joint. It took 24 hours to cure, so the Whitcomb did not run Sunday night. Monday morning we filled the radiator and it held water. I hooked up the radiator hoses and filled the engine with water. I ran the engine back and forth on the track by the station. The torque converter did not seem to be working just right and the engine was leaking oil but this is another step closer to being complete and running. 50 people attended the volunteer picnic. The temperature was in the 70’s and the food was ahhhhh awesome.
Monday, May 2, 2011
Hank and i went up to the museum in May and installed the fan, fan shroud. We started the enjine and it seemed to be running rich. I am thinking the float valves are sticking open or the fuel pump is pushing gas past them. The water was not on so we couldnt check the new radiator for leaks.
The Bessimer speeder is now at the Museum (photo)
Thursday, April 14, 2011
Radiator together
We had a blessed day Thursday. I picked the day because of good weather. I sent an info Email to Chris Bohn. He said he would be there. We met about 10 AM. I asked my brother Pete to help because I anticipated some heavy lifting. We unbolted the top tank and rolled it up on the hood. Chris made a bunch of measurements. We did not find any obstructions, it should fit. The edges of the hood were bent in blocking the radiator from going back under it. We used a 4 foot ajusta post to spread the edges of the hood. We put the top tank back in place. Chris used a tapered reamer to clear out the holes for the bolts. The radiator got straighter and straighter as we tightened the bolts. All the jacks and blocking came out and it is pretty much back together. Hank and I will test it with water when we get a chance.
Saturday, March 19, 2011
Radiator assembly
These are some of the great volunteers at the Saturday morning paper recycling at the Train museum. It was a cold windy 33 degree March morning in Norh East, Pennsylvania.
I got the new TitanX radiator core from the station. After removing one of the test tanks from the end of the core, I got a group of volunteers who were working on the gift shop in the station. We lifted the core up by hand and put it in place on the bottom tank.
While they went back to work, Charley and I put in some of the bolts that connect the core to the bottom tank. I removed the other test tank from the top and got the guys again to help with the top tank. We found that the top tank weighed more than the core and we needed to get the tractor with fork lift to get the top tank up to a level where Charles and I could move it over in place on top of the core.
When we got it in place it didn’t fit right. The radiator needs to be disassembled and a seam on the top and bottom of the core ground down and re-soldered then reassembled.
I got the new TitanX radiator core from the station. After removing one of the test tanks from the end of the core, I got a group of volunteers who were working on the gift shop in the station. We lifted the core up by hand and put it in place on the bottom tank.
While they went back to work, Charley and I put in some of the bolts that connect the core to the bottom tank. I removed the other test tank from the top and got the guys again to help with the top tank. We found that the top tank weighed more than the core and we needed to get the tractor with fork lift to get the top tank up to a level where Charles and I could move it over in place on top of the core.
When we got it in place it didn’t fit right. The radiator needs to be disassembled and a seam on the top and bottom of the core ground down and re-soldered then reassembled.
Sunday, February 27, 2011
Chris and the guys from TitanX finished building the radiator core. The sheet metal man at TitanX did a beautiful job of fabricating test tanks so that the core could be sealed up and air tested. Two small leaks were repaired and the core was ready for delivery. Ryan transported the radiator core up to the museum. Now Hank and I have to get up there and install it.
Thursday, January 6, 2011
I took advantage of a break in the weather in January to go up to the museum and check on the Whitcomb. Everything was in order. The Polar Summit was getting a broken spring replaced. I posted a picture that I took this fall of NS dropping off ties. The train was moving along while the excavator was running on top of the gondola cars. Two men were walking along directing the excavator operator where to drop the ties. It was interesting to watch.