Commentary about volunteering to overhaul the 200 hp LeRoi engine in a Whitcomb switch locomotive for a non profit museum. I got it running in 2009. TitanX Donated a new radiator core in 2011. Plymouth locomotive arrives 2014.
Thursday, April 21, 2016
I went up to the museum in April to charge the batteries and check the locomotives in preparation of a locomotive run May 22. I put 6 gal of gas in the Whitcomb. I charged the batteries on the Plymouth and noticed that the throttle was stuck. Evidently the water leaking from a gasket rusted up the throttle linkage. I put a vice grip on the linkage and oiled it. I worked it back and forth until it was free. I put some epoxy on the joint that was leaking. Tim and I started the Whitcomb and the Plymouth. I worked on the plymouth hand brake. Ray and company are replacing ties on the ladder track.




Subscribe to:
Posts (Atom)