Saturday, April 11, 2009

April 11 2009


We made 2 brake linkage pins from 1 1/4 inch bar stock. I made a clock, and an armrest to replace the rough old 2 x 4 bolted to the window. My son Dave came up to help lift the engine blocks. New base gaskets were cut out. We lifted the blocks to the walkway beside the engine. The rod caps were removed and the nuts put on to keep the shims from falling in the crankcase. The pistons were pushed to the top of the cylinders and the crankshaft turned until one of the two journals was at TDC. It took 3 guys to lift the blocks and put them on the crankcase. Steve helped us with the first one and James helped with the other two. The pistons were tapped down until the rod was on the crankshaft and the nuts were put on. They are not wired yet.
Hank and I put the last of the brake linkage together with the 2 new linkage pins. We had to use crow bars and jacks as the brake shoe and heavy linkage arms wanted to go every way but line up. Hank and I put the rebuilt heads on. I decided to go with newer type of tappets. They would not fit in the crankcase. Hank will machine them. much more work is needed. Donations are needed for hoses, belts, batteries etc. The radiator needs removed and the bottom tank welded.

1 comment:

The Educated Fool said...

I've been enjoying following your progress. If we weren't broke as we're starting our own business, I would definitely like to donate to your cause. My grandfather was one of the founders of LSRHS, and my wife and I have been members since we attended a ceremony with my parents which commemorated naming the LSRHS library after him. This is some grueling work you're doing!