It happens all the time on your model railroad; You assemble the train and start out when, Oh crap it came uncoupled. A full size prototype exists for that. We loaded up the caboose with people for a ride and started out, the two engines left the rest of the train behind. (how embarrassing - not really). A little adjustment on the coupler and we had no trouble after that. It was cold and rainy Saturday but cleared up Sunday afternoon.
Commentary about volunteering to overhaul the 200 hp LeRoi engine in a Whitcomb switch locomotive for a non profit museum. I got it running in 2009. TitanX Donated a new radiator core in 2011. Plymouth locomotive arrives 2014.
Saturday, September 26, 2009
Fall colors: Red, Orange and Yellow
It happens all the time on your model railroad; You assemble the train and start out when, Oh crap it came uncoupled. A full size prototype exists for that. We loaded up the caboose with people for a ride and started out, the two engines left the rest of the train behind. (how embarrassing - not really). A little adjustment on the coupler and we had no trouble after that. It was cold and rainy Saturday but cleared up Sunday afternoon.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment