Commentary about volunteering to overhaul the 200 hp LeRoi engine in a Whitcomb switch locomotive for a non profit museum. I got it running in 2009. TitanX Donated a new radiator core in 2011. Plymouth locomotive arrives 2014.
Thursday, January 6, 2011
I took advantage of a break in the weather in January to go up to the museum and check on the Whitcomb. Everything was in order. The Polar Summit was getting a broken spring replaced. I posted a picture that I took this fall of NS dropping off ties. The train was moving along while the excavator was running on top of the gondola cars. Two men were walking along directing the excavator operator where to drop the ties. It was interesting to watch.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment