Commentary about volunteering to overhaul the 200 hp LeRoi engine in a Whitcomb switch locomotive for a non profit museum. I got it running in 2009. TitanX Donated a new radiator core in 2011. Plymouth locomotive arrives 2014.
Wednesday, June 24, 2009
Jun 24,25,26
The Whitcomb has 2 Zenith carburetors and 2 governor bodies The governor linkage did not fit up well so I decided that the governors were facing the wrong way. So I had to take them off make new gaskets and put them back on with the linkage facing in. I wired the coil, voltage regulator, and magneto. The cotter pins in the air compressor connecting rod were not through the castle nuts. I tried some different things and ended up putting lock washer under the nuts to bring them down far enough for the cotter pins to be effective. I crawled under the back axle to connect the clutch linkage. I found I had to loosen the clutch air cylinder to get the pin in the linkage. I did find the grease fittings for the axles. They are hard to get to without getting under the axles between the wheels.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment