Commentary about volunteering to overhaul the 200 hp LeRoi engine in a Whitcomb switch locomotive for a non profit museum. I got it running in 2009. TitanX Donated a new radiator core in 2011. Plymouth locomotive arrives 2014.
Wednesday, June 3, 2009
June 2,3,4
I put the reconditioned valves back in the air compressor. I took a passenger car battery which was new, to bulldog battery in Cleveland. They put battery acid in it and I took it back. Cyd helped me get it in the Whitcomb. I bought a 30 gallon drum to replace the gas tank. I put a 3/8 ball valve on it. I thought we might be able to close the split in the bottom of the radiator with a steel plate. I measured and drew plans for the fix. I bought 2 pieces of “C” channel and a piece of ¼ plate. Hank drilled it to match the bolt pattern on the bottom radiator tank.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment